FAQs
More FAQs- How long will it take to have my floors coated with acrylic?
- When will I be able to walk on my floors?
- Are there instructions to follow after my tile & grout surfaces are cleaned?
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.
Hard-surface floors treated with an acrylic finish can be lightly walked on within an hour after the last coat was applied. We recommend allowing the floor to dry for 24 hours before allowing heavy traffic on it.
Stay off freshly cleaned tile for at least 30 minutes and avoid getting any liquid on the floor for 24 hours if sealant has been applied. Return furniture (with suggested use of felt pads) and rugs to floors after 24 hours.