FAQs
More FAQs- How long will it take to have my floors coated with acrylic?
- Are there instructions to follow after my carpets are cleaned?
- Will the application of acrylic disrupt my business?
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.
Immediately after cleaning, it’s best to allow carpets to dry for 6-8 hours before walking on them. Walking on them may flatten the fibers. Use air movers if needed to help air circulation as this will speed up the drying time. If a carpet protector such as ScotchgardTM was applied, foot traffic should be minimized for up to 24 hours to let the product cure. Don’t move any furniture back in place until carpet is completely dry or the Scotchgard carpet protector has cured.
Unless your facility is open 24 hours, ServiceMaster Clean Of Durham & Scarborough can work after hours and the area worked on can be up and running the next business day. If your facility is open 24/7, we can work with you to determine the hours that are least busy. During those hours we can come, cordon off traffic areas and work in a manner that minimizes disruption of your work environment.